Share on FacebookTweet about this on TwitterEmail this to someone
Share on FacebookTweet about this on TwitterEmail this to someone
File photo
File photo
From Thursday, March 21 until Saturday, March 23 there will be closures on the Bronx-Whitestone Bridge.

In order to install and remove overhead sign structures, the Bronx-Whitestone Bridge will be closed in both directions for about 15 minutes on Friday, March 22 and Saturday, March 23 for the installation and removal of overhead sign structures.

The full bridge closure will take place on Friday between 1 a.m. and 3 a.m. and on Saturday between 2 a.m. and 5 a.m., according to the MTA

One lane will also be closed in each direction Thursday, March 21 and on Friday, March 22 from 11 p.m. to 5 a.m.and, again from 12:01 a.m. until noon on Saturday, March 23.

Drivers should expect delays and consider using the Throgs Neck Bridge as an alternative.

The work is dependent on good weather.

 

RECOMMENDED STORIES

Comments:

Join The Discussion



Related Stories
Bronx-Whitestone Bridge to temporarily close overnight
Bronx-Whitestone Bridge to temporarily close overnight
Popular Stories
Photo by NYPD and Google Maps
Flushing’s Bowne Playground was the scene of two recent pedophile attacks
Photos by Google Maps and NYPD
Three teenage burglars force their way into a Fresh Meadows apartment at gunpoint
Photo via Wikimedia Commons
College Point, Flushing and Whitestone will be sprayed from trucks this week to reduce the Zika threat
Skip to toolbar