Quantcast

Traffic News and Updates

New York City Department Of Transportation

Because of ongoing construction work at several locations throughout Queens and Brooklyn, the city DOT has announced numerous street closures in local neighborhoods for the upcoming week.

The announced diversions are current as of Wednesday, June 25, and weather permitting. The DOT may shut down other roads should the need for emergency repairs arise.

Streets and highways that are affected by closures during this week include the following:

Street Resurfacing In Woodhaven, LIC

Weather permitting, DOT crews will conduct street milling along the following streets:

– 75th Street between 85th and 86th roads in Woodhaven for paving on Friday, June 27;

– 85th Drive between 75th Street and Dexter Court in Woodhaven for paving on Thursday, June 26;

– 85th Road between Dexter Court and 75th Street in Woodhaven for paving on Thursday, June 26;

– 85th Road between Woodhaven Boulevard and Forest Parkway in Woodhaven for paving on Thursday, June 26;

– 86th Road between Dexter Court and 76th Street in Woodhaven for paving on Thursday, June 26;

– 98th Street between Atlantic Avenue and Woodhaven Boulevard in Woodhaven for paving on Friday, June 27;

– Dexter Court between Jamaica Avenue and 85th Road in Woodhaven for paving on Friday, June 27;

– Northern Boulevard between 41st Avenue and 48th Street in Long Island City for nighttime milling on Friday, June 27; and

– Park Lane South between Woodhaven Boulevard and Forest Parkway in Woodhaven for paving on Friday, June 27.

Parking is prohibited on these streets during work hours; all vehicles found parked will be towed away at the owner’s expense.

Lane Closures On

Van Wyck Expwy.

One of three lanes in each direction of the Van Wyck Expressway between Jewel Avenue and Union Turnpike may be closed on Monday through Friday from 10 a.m. until 2 p.m. due to construction work related to the Kew Gardens rehabilitation project.

Additionally, up to two lanes in either direction of the expressway in the same section may be closed on overnights from 1 to 5 a.m.

Kew Gdns. Project Affects Union Tpke.

Long-term construction related to the state Department of Transportation’s Kew Gardens Interchange project will require the right lane of Union Turnpike eastbound to be closed at all times between 128th and 134th streets. All existing traffic lanes will remain open and are shifted to the left.

Lane Closures On Grand Central Pkwy.

One lane of the Grand Central Parkway in each direction will be closed between 82nd and 111th streets on weekdays from 10 a.m. until 2 p.m. and 10 p.m. until 5 a.m. on weekdays. Lane closures will also take place from 10 p.m. Fridays to 7 a.m. Saturdays and from 10 p.m. Saturdays to 3 p.m. Sundays.

Two lanes of traffic in each direction may be closed on weeknights from 12:01 until 5 a.m., Saturdays from 1 to 6 a.m. and Sundays from 1 to 9 a.m.

Additionally, the left lane in both directions on the Grand Central Parkway may be closed at 44th Street for two nights through Friday, May 2, from 11 p.m. to 5 a.m. to allow DOT crews to conduct bridge maintenance.

Exit Ramp Closed

Near Whitestone Br.

The Third Avenue exit on the northbound approach to the Whitestone Bridge is closed to all traffic as part of a $109 million reconstruction project.

Separate car and truck detours will be in place while the exit ramp is closed. Signs will be in place and traffic agents will be on hand when the detours begin. The closure is expected to remain in place for approximately two years.

Passenger vehicles driving from the northbound Cross Island Parkway will have to exit at Utopia Parkway (exit 34); those driving from the northbound Whitestone Expressway will need to exit past the 20th Avenue exit and merge onto the Cross Island Parkway.

All commercial vehicles must exit the Whitestone Expressway at 20th Avenue (exit 15).

For additional closures, visit the city DOT’s website at www.nyc.gov/dot or call 311.