For Lizi Rahman and all other family members who have lost loved ones on Queens Boulevard, their dream of putting an end to the “Boulevard of Death” is finally starting to become reality.
Rahman — whose 22-year-old son Asif was fatally struck while riding his bicycle home in 2008 — joined Mayor Bill de Blasio, Department of Transportation (DOT) representatives and local elected officials and community leaders on Thursday morning in Woodside to announce the beginning of the $100 million redesign of the busy thoroughfare which has claimed 185 lives since 1990.
“I decided to do everything in my power to get a bike lane on Queens Boulevard so that bicyclists would feel safe and no mother would go through this pain of losing a child,” Rahman said. “There were times when I was discouraged. I almost gave up but then I saw light at the end of the tunnel when Mayor de Blasio was elected. Now my dream is not a dream anymore; it became a reality.”
The first phase of the redesign project, which was unanimously approved by Community Board 2 last month, will focus on the 1.3-mile section of Queens Boulevard between Roosevelt Avenue and 73rd Street, an area which saw six deaths, 36 severe injuries and 591 more hurt in traffic accidents between 2009 and 2013.
“Here is a lesson if ever there was one, on the fact that we had to change things here on Queens Boulevard. We were losing too many good people, and we could avoid those losses. And finally, the actions are being taken to save lives here on Queens Boulevard that should’ve happened long ago,” de Blasio said on Thursday.
The redesign of the thoroughfare is expected to decrease drivers from switching repeatedly between the main line and service road. The overall plan will be to get rid of the “highway-like design features” which encourage drivers to speed.
The improvements on the stretch, which will be installed through October, include safer crossings installed along the corridor; pedestrian islands and new mid-block crossings constructed to give pedestrians more time to cross; and the addition of high-visibility crosswalks and new signals.
“We have an obligation to make sure that not one more person loses their life on this boulevard,” Councilman Jimmy Van Bramer said. “We will transform Queens Boulevard into that ‘Boulevard of Life.’ We will make it safer for everyone, pedestrians, cyclists and motorists, all living in harmony and in safety.”
The DOT will also add protected bike lanes with buffers and new pedestrian space along the median next to the service lane in both directions. A raised, concrete bicycle path will be constructed under the overpass on the eastbound service road from 67th to 69th streets.
The project will also include pedestrian ramps being upgraded to be ADA-complaint improving accessibility to those with disabilities, and service roads will be reduced to one moving lane in each direction.
The DOT plans to soon begin the phase of the redesign of Queens Boulevard from 73rd Street to Eliot Avenue, and after from Eliot Avenue to Jamaica Avenue.
“So for all the people who depend on this crucial road, life will change for the better. And we’re going to use every tool we have to continue that work — not just on Queens Boulevard, but all over the city,” de Blasio said.
RECOMMENDED STORIES