Quantcast

DOE plans to re-site Corona schools

PS-3301-624×416
THE COURIER/Angy Altamirano

The Department of Education (DOE) has proposed a plan to temporarily move a grade from an overcrowded Corona school to a new campus slated to open in September.

If the plan is approved, some students at P.S. 330, located at 110-08 Northern Blvd., would be shifted to Q315, which is currently under construction at 43-18 97th Pl. for the 2015-2016 school year.

Students from two other schools have already been approved to be moved to the same location for the coming school year. In November, the Panel for Educational Policy approved a proposal to re-site P.S. 110 to building Q315, where it will be co-located with a new site of existing District 75 school P.S. 227.

If the DOE’s proposal is approved, students from P.S. 330, P.S. 110 and P.S. 227 would be co-located at the Q315 building, meaning that they may share common spaces such as auditoriums, gyms, libraries and cafeterias in that building.

In February, it was determined that P.S. 330 could not accommodate kindergarten students in its building for the 2015-2016 school year. The re-siting and co-location of P.S. 330’s kindergarten class is necessary to enroll kindergarten students at P.S. 330, DOE claims. This will provide a sufficient number of kindergarten seats in District 24, a historically overcrowded district, according to the DOE.

P.S. 110 currently has students in kindergarten through second grade at their building at 48-25 37th St. and will move to building Q315 before the 2015-2016 school year. With the move to Q315, P.S. 110 is planning on phasing in to serving students from kindergarten to grade five.

P.S. 110 is an existing non-zoned elementary school that serves students who are overflowed from their zoned schools in Corona and Elmhurst. In May, the District 24 Community Education Council approved a plan to create an elementary school zone for Q315. P.S. 110 will operate as a zoned elementary school starting in September 2015.

P.S. 330 is a zoned elementary school that serves students from kindergarten to fourth grade, and plans to phase in to cater to fifth-graders as well for the 2015-2016 school year.

According to the School Construction Authority, building Q315 will have a 1,110-student capacity and includes a designed space for a District 75 school. With this proposal, P.S. 110 is projected to serve 350 to 390 kindergarten through third-grade students, and P.S. is set to serve approximately 50 to 60 kindergarten students in Q315.

Opportunities for the public to speak on the subject will include two joint public hearings at 110-08 Northern Blvd. and 48-25 37th St. There are dedicated phone and email lines at 212-347-7621 and D24Proposals@schools.nyc.gov.

RECOMMENDED STORIES